• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 1 INTRODUCTION - TM-5-4220-227-14_15
List of Abbreviations
Section II.  EQUIPMENT DESCRIPTION AND DATA - TM-5-4220-227-14_17
Location and Description of Major Components - TM-5-4220-227-14_18
Figure 1-2.  Location and Description of Major Components (Sheet 1 of 2)
Figure 1-2.  Location and Description of Major Components (Sheet 2 of 2)
Equipment Data - TM-5-4220-227-14_21
Compressed  Air  Supply  Requirements
Safety, Care, and Handling
Section III.  PRINCIPLES OF OPERATION - TM-5-4220-227-14_24
Figure 1-3.  Flow Diagram (Sheet 1 of 3)
KEY TEXT LEGEND
Figure 1-3.  Flow Diagram (Sheet 3 of 3).
Figure 1-4.  Electrical Diagram
CHAPTER 2 OPERATING INSTRUCTIONS - TM-5-4220-227-14_29
oFigure 2-1.  Electrical Control Panel Controls and Indicators (Sheet 1 of 2)
Figure 2-1.  Electrical Control Panel Controls and Indicators (Sheet 2 of 2)
General. - TM-5-4220-227-14_32
General. (cont) - TM-5-4220-227-14_33
Figure 2-2. Chamber Control Console Controls and Indicators
General. (cont) - TM-5-4220-227-14_35
Figure 2-3.  Gages, Valves, and Switches Controls and Indicators (Sheet 1 of 2).
Figure 2-3.  Gages, Valves, and Switches Controls and Indicators (Sheet 2 of 2)
General. (cont) - TM-5-4220-227-14_38
Section II.  OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - TM-5-4220-227-14_39
Reporting  Deficiencies
Table 2-1.  Operator Preventive Maintenance Checks and Services (PMCS) (Cont). - TM-5-4220-227-14_41
Scrubber Service
Figure 2-4.  Scrubber Assembly, Service.
Section III.  OPERATION UNDER USUAL CONDITIONS - TM-5-4220-227-14_44
Figure 2-5.  Recompression Chamber Operating Procedure Flowchart
Figure 2-6.  Door Procedure Plate
Figure 2-7.  Warning Plates
Figure 2-8.  Manufacturer's Data Plates
Figure 2-9.  ANSI/ASME Certification Data Plate
Figure 2-10.  System Startup Checklist (Sheet 1 of 11)
Figure 2-10.  System Startup Checklist (Sheet 2 of 11)
Figure 2-10.  System Startup Checklist (Sheet 3 of 11).
Figure 2-10.  System Startup Checklist (Sheet 4 of 11 )
Figure 2-10.  System Startup Checklist (Sheet 5 of 11 )
uFigure 2-10.  System Startup Checklist (Sheet 6 of 11)
Figure 2-10.  System Startup Checklist (Sheet 7 of 11).
Figure 2-10.  System Startup Checklist (Sheet 8 of 11)
Figure 2-10.  System Startup Checklist (Sheet 9 of 11)
Figure 2-10.  System Startup Checklist (Sheet 10 of 11).
Figure 2-10.  System Startup Checklist (Sheet 11 of 11)
Normal Operating Procedures
Figure 2-11.  Normal Operating Procedures Checklist (Sheet 1 of 9)
Figure 2-11. Normal Operating Procedures Checklist (Sheet 2 of 9)
Figure 2-11. Normal Operating Procedures Checklist (Sheet 3 of 9)
Figure 2- 1.  Normal Operating Procedures Checklist (Sheet 4 of 9)
Figure 2-11.  Normal Operating Procedures Checklist (Sheet 5 of 9)
Figure 2-11.  Normal Operating Procedures Checklist (Sheet 6 of 9)
Figure 2- 11.  Normal Operating Procedures Checklist (Sheet 7 of 9)
Figure 2-11.  Normal Operating Procedures Checklist (Sheet 8 of 9)
Figure 2-11.  Normal Operating Procedures Checklist (Sheet 9 of 9)
Shutdown Procedures.
Figure 2-12.  Shutdown Procedures Checklist (Sheet 1 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 2 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 3 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 4 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 5 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 6 of 7).
Figure 2-12.  Shutdown Procedures Checklist (Sheet 7 of 7).
Figure 2-13.  Modified Startup Procedures Checklist (Sheet 1 of 5).
Figure 2-13.  Modified Startup Procedures Checklist (Sheet 2 of 5)
Figure 2-13.  Modified Startup Procedures Checklist (Sheet 3 of 5)
Figure 2-13.  Modified Startup Procedures Checklist (Sheet 4 of 5)
Figure 2-13.  Modified Startup Procedures Checklist (Sheet 5 of 5).
Figure 2-14.  Modified Shutdown Procedures Checklist (Sheet 1 of 5)
Figure 2-14.  Modified Shutdown Procedures Checklist (Sheet 2 of 5)
Figure 2-14.  Modified Shutdown Procedures Checklist (Sheet 3 of 5).
Figure 2-14.  Modified Shutdown Procedures Checklist (Sheet 4 of 5).
Figure 2-14.  Modified Shutdown Procedures Checklist (Sheet 5 of 5).
Section IV.  OPERATION UNDER UNUSUAL CONDITIONS - TM-5-4220-227-14_89
Figure 2-15.  Emergency Procedures Checklist (Sheet 1 of 8)
Figure 2-15.  Emergency Procedures Checklist (Sheet 2 of 8)
uFigure 2-15.  Emergency Procedures Checklist (Sheet 3 of 8)
Figure 2-15.  Emergency Procedures Checklist (Sheet 4 of 8)
Figure 2-15.  Emergency Procedures Checklist (Sheet 5 of 8)
Figure 2-15.  Emergency Procedures Checklist (Sheet 6 of 8)
Figure 2-15.  Emergency Procedures Checklist (Sheet 7 of 8).
Figure 2-15.  Emergency Procedures Checklist (Sheet 8 of 8)
CHAPTER 3 OPERATOR MAINTENANCE - TM-5-4220-227-14_98
Section II.  OPERATOR TROUBLESHOOTING PROCEDURES - TM-5-4220-227-14_99
CHAPTER 4 UNIT MAINTENANCE - TM-5-4220-227-14_100
Section II.  SERVICE UPON RECEIPT - TM-5-4220-227-14_101
Figure 4-1.  End View
Figure 4-2.  Elevation View
Oxygen Supply
Chamber Doors (I/L and O/L)
Electrical Connections
Table 4-1 Unit Preventive Maintenance Checks and Services (PMCS)
Table 4-1.  Unit Preventive Maintenance Checks and Services (PMCS) (Cont). - TM-5-4220-227-14_108
Table 4-1.  Unit Preventive Maintenance Checks and Services (PMCS) (Cont). - TM-5-4220-227-14_109
Service of Door Seals
Figure 4-4.  Service of Medical Lock Outer Door Seals
Figure 4-5.  Service of Medical Lock Inner Door Seals
SYMPTOM INDEX - TM-5-4220-227-14_113
Table 4-2.  Unit Troubleshooting Procedures. - TM-5-4220-227-14_114
Table 4-2.  Unit Troubleshooting Procedures (Cont). - TM-5-4220-227-14_115
Table 4-2.  Unit Troubleshooting Procedures (Cont). - TM-5-4220-227-14_116
Table 4-2.  Unit Troubleshooting Procedures (Cont). - TM-5-4220-227-14_117
Table 4-2.  Unit Troubleshooting Procedures (Cont). - TM-5-4220-227-14_118
Table 4-2.  Unit Troubleshooting Procedures (Cont). - TM-5-4220-227-14_119
Section V.  UNIT MAINTENANCE PROCEDURES - TM-5-4220-227-14_120
Depressurization Valve and Gage (Medical Lock).
Figure 4-6.  Depressurization Valve and Gage, Replace
Pressurization Valve (Inner Lock Door)
Figure 4-7.  Pressurization Valve (Inner Lock Door), Replace
Cot Assemblies (I/L).
Figure 4-8.  Cot Assemblies, Replace
Deck Plates
Figure 4-9.  Deck Plates, Replace
Heater/Chiller Module - TM-5-4220-227-14_129
Figure 4-10.  Heater/Chiller Module, Replace.
Pressure Relief Valve Assembly
oFigure 4-11.  Pressure Relief Valve Assembly, Replace
Water Valves (3/4 in.).
Figure 4-12.  Water Valves (3/4 In.), Replace.
Water Valves (3/4 in.) (Cont).
Figure 4-13.  Heater/Chiller Fluid Valves Repair
Hoses
Figure 4-14.  Hoses, Replace
Power Supply, 28V
Figure 4-15.  Power Supply, 28V, Replace
Scrubber Assembly
Figure 4-16.  Scrubber Assembly, Replace.
Portable Oxygen Analyzer (POA)
Figure 4-17.  Portable Oxygen Analyzer (POA), Replace.
Thermocoupler Meter and Temperature Probe
Figure 4-18.  Thermocoupler Meter and Temperature Probe, Replace.
Ground Fault Interrupter
Figure 4-19.  Ground Fault Interrupter, Replace
Six Plug Receptacle Power Strip.
Figure 4-20.  Six Plug Receptacle Power Strip, Replace.
Double Light Power Supply (Inner Lock). - TM-5-4220-227-14_151
Figure 4-21.  Double Light Power Supply (Inner Lock), Replace
Repair
Figure 4-22.  Double Light Power Supply (Inner Lock) Fuse, Replace
 Light Source
Figure 4-23.  Light Source, Replace
Repair. - TM-5-4220-227-14_157
Figure 4-24.  Light Source, Repair
Single Light Power Supply (Outer Lock)
Figure 4-25.  Single Light Power Supply (Outer Lock), Replace
Repair. - TM-5-4220-227-14_161
Figure 4-26.  Single Light Power Supply (Outer Lock) Fuse, Replace.
Single Light Power Supply (Outer Lock). - TM-5-4220-227-14_163
Figure 4-27.  Fluorescent Light Assembly, Replace
Repair - TM-5-4220-227-14_165
Figure 4-28.  Fluorescent Light Assembly, Repair
Wiring Harness
Figure 4-29.  Wiring Harness, Fuse Replace
Communicator Assembly
Figure 4-30.  Communicator Assembly, Replace.
Battery Card and Case - TM-5-4220-227-14_171
Figure 4-31.  Battery Card and Case, Fuse Replacement.
Microphone
Figure 4-32.  Microphone, Replace
Headset
Figure 4-33.  Headset, Replace
Sound Powered Phones and Bracket
Figure 4-34.  Sound Powered Phones and Bracket, Replace
Speakers, I/L and O/L
Figure 4-35.  Speakers, I/L and O/L, Replace
O2K Bottles and Manifold
Figure 4-36.  02 K Bottles and Manifold, Replace.
Oxygen Inhalator Mask Assembly.
Figure 4-37.  Oxygen Inhalator Mask, Replace
Section VI.  UNIT LEVEL CLEANING PROCEDURE FOR DIVING LIFE SUPPORT AIR SYSTEMS - TM-5-4220-227-14_185
Installation or Reinstallation - TM-5-4220-227-14_186
Cleaning Components or Assemblies
Cleaning  Method  Trisodium  Phosphate  (TSP).
Table 4-3.  TSP Cleaning Solution Volume. - TM-5-4220-227-14_189
Table 4-4.  Cleaning Solution Flow Rate - TM-5-4220-227-14_190
Table 4-5.  Cleaning Agents Comparable with Soft Goods. - TM-5-4220-227-14_191
Hydrocarbon Inspection and Analysis.
Documentation and Record Keeping - TM-5-4220-227-14_193
CHAPTER 5 DIRECT SUPPORT MAINTENANCE - TM-5-4220-227-14_194
Direct Support Troubleshooting Procedures
Table 5-1.  Direct Support Troubleshooting Procedures (Cont).
Section III.  DIRECT SUPPORT MAINTENANCE PROCEDURES - TM-5-4220-227-14_197
Medical Lock (M/L) Outer Door Assembly
Figure 5-1.  Medical Lock (M/L) Outer Door Assembly, Replace
Repair. - TM-5-4220-227-14_200
Figure 5-2.  Medical Lock (M/L) Outer Door Assembly, Repair.
Medical Lock (M/L) Inner Door Assembly.
Figure 5-3.  Medical Lock (M/L) Inner Door Assembly, Replace
Repair - TM-5-4220-227-14_204
Figure 5-4.  Medical Lock (M/L) Inner Door Assembly, Repair
Pressure Relief Valve.
Figure 5-5.  Pressure Relief Valve, Replace.
Ball Valve 3/4 Inch (Pressure Relief Valve Assembly)
Figure 5-6.  Ball Valve 3/4 Inch, Replace
Repair. - TM-5-4220-227-14_210
Figure 5-7.  Ball Valve 3/4 Inch, Repair
Skid Assembly, Chamber
Figure 5-8.  Skid Assembly Chamber, Replace
Chamber Instrument Panel and Hood Assembly
Figure 5-9.  Chamber Instrument Panel and Hood Assembly Enclosure, Replace (Sheet 1 of 2)
Replace.   - TM-5-4220-227-14_216
Figure 5-9.  Chamber Instrument Panel and Hood Assembly Enclosure, Replace (Sheet 2 of 2)
Heater/Chiller Unit (CCU-03)
Figure 5-10.  Heater/Chiller Unit (CCU-03), Replace
Replace. - TM-5-4220-227-14_220
Heater/Chiller Unit Motor.
Figure 5-11.  Heater/Chiller Unit Motor, Replace
Scrubber Assembly, Motor
Figure 5-12.  Scrubber Assembly Motor, Replace
Portable Oxygen Analyzer Battery
Figure 5-13.  Portable Oxygen Analyzer Battery, Replace
Portable Oxygen Analyzer Probe Assembly
Figure 5-14.  Portable Oxygen Analyzer Probe Assembly, Replace.
Repair. - TM-5-4220-227-14_229
Figure 5-15.  Portable Oxygen Analyzer Probe Assembly, Repair
Flow Meter.
Figure 5-16.  Flow Meter, Replace
Replace - TM-5-4220-227-14_233
Double Light Power Supply (Inner Lock). - TM-5-4220-227-14_234
Figure 5-17.  Double Light Power Supply (Inner Lock) Switch, Replace
Figure 5-18.  Double Light Power Supply (Inner Lock) Indicator Light, Replace
Figure 5-19.  Double Light Power Supply (inner Lock) Variac Unit, Replace
Figure 5-20.  Double Light Power Supply (Inner Lock) Transformer, Replace
Figure 5-21.  Double Light Power Supply (Inner Lock) Power and Light Cords, Replace.
Light Source.
Figure 5-22.  Light Source, Repair
Repair.   - TM-5-4220-227-14_242
Single Light Power Supply (Outer Lock). - TM-5-4220-227-14_243
Figure 5-23.  Single Light Power Supply (Outer Lock) Switch, Replace.
Replace indicator light.
Figure 5-25.  Single Light Power Supply (Outer Lock) Variac Unit, Replace
Figure 5-26.  Single Light Power Supply (Outer Lock) Transformer, Replace
Figure 5-27.  Single Light Power Supply (Outer Lock) Power and Light Cords, Replace
Fluorescent Light
Figure 5-28.  Fluorescent Light, Repair
Repair.   - TM-5-4220-227-14_251
Wiring Harness. - TM-5-4220-227-14_252
Replace.   - TM-5-4220-227-14_253
Figure 5-30.  Wiring Harness, Replace (Sheet 1 of 3).
Repair - TM-5-4220-227-14_255
Figure 5-30.  Wiring Harness, Replace (Sheet 2 of 3).
Figure 5-30.  Wiring Harness, Replace (Sheet 3 of 3).
Front Panel Chassis Assembly
oFigure 5-31.  Front Chassis Assembly, Replace
Figure 5-32.  Front Panel Chassis Assembly Switch, Replace
Figure 5-33.  Front Panel Chassis Assembly Potentiometer and Rheostat, Replace
Figure 5-34.  Front Panel Chassis Assembly Indicator Light, Replace
Figure 5-35.  Front Panel Chassis Assembly Banana Jack, Replace
Figure 5-36.  Front Panel Chassis Assembly Phone Jack, Replace
Figure 5-37.  Front Panel Chassis Assembly Microphone Holder, Replace]
Replace power speaker assembly
Figure 5-38.  Front Panel Chassis Assembly Power Speaker Assembly, Replace
Circuit Card
Figure 5-39.  Circuit Card, Replace
Battery Sense Card Assembly
Figure 5-40.  Battery Sense Card Assembly, Replace
Battery Card and Case - TM-5-4220-227-14_272
Figure 5-41.  Battery Card and Case, Replace
Figure 5-42.  Battery Card and Case, Replace
Figure 5-43.  Battery Card and Case Battery Contact P.C.  Card, Replace.
Figure 5-44.  Battery Card and Case Fuse Holder, Replace
Figure 5-45.  Battery Card and Case Power Transformer, Replace
Replace battery charger P.C.  card assembly
Figure 5-46.  Battery Card and Case Battery Charger P.  C.  Card Assembly, Replace
O2 "K" Bottles/Manifold.
Figure 5-47.  O2 "K" Bottles/Manifold, Repair (Sheet 1 of 2)
Repair - TM-5-4220-227-14_282
Figure 5-47. O2"K" Bottles/Manifold, Repair (Sheet 2 of 2).
Gage (O2 "K" Bottles/Manifold)
Figure 5-48.  Gage (O2 "K" Bottles/Manifold), Replace
Oxygen Pressure Gages.
Figure 5-49.  Oxygen Pressure Gages, Replace
Replace.   - TM-5-4220-227-14_288
Pressure Regulator.
Figure 5-50.  Pressure Regulator, Replace
Replace. - TM-5-4220-227-14_291
Back Pressure Regulators.
Figure 5-51.  Back Pressure Regulators, Replace
Replace. - TM-5-4220-227-14_294
Shutoff Valves (Oxygen)
Figure 5-52.  Shutoff Valve (Oxygen), Replace.
Replace. - TM-5-4220-227-14_297
Isolator Valves.
Figure 5-53.  Isolator Valves, Repair
Replace. - TM-5-4220-227-14_300
Dump Valves
Figure 5-54.  Dump Valves and Silencers, Replace
Replace. (cont)
Figure 5-55.  Dump Valves, Repair
Oxygen BIBS Manifold
Figure 5-56.  Oxygen BIBS Manifold, Replace
Inhalator Mask Assembly
Figure 5-57.  Inhalator Mask Assembly, Repair.
 Inhalator Mask Demand/Exhaust Regulators
Figure 5-58.  Inhalator Mask Demand/Exhaust Regulators, Replace.
Dual Hose Assembly
Figure 5-59.  Dual Hose Assembly, Replace
Repair. - TM-5-4220-227-14_313
Figure 5-60.  Dual Hose Assembly, Repair
O2 and Air Piping
Figure 5-61.  02 and Air Piping, Removal (Sheet 1 of 2)
Replace. - TM-5-4220-227-14_317
Figure 5-61.  02 and Air Piping, Removal (Sheet 2 of 2).
Install. - TM-5-4220-227-14_319
Figure 5-62.  02 and Air Piping, Installation (Sheet 1 of 2)
Install. - TM-5-4220-227-14_321
Figure 5-62.  02 and Air Piping, Installation (Sheet 2 of 2)
Air Supply Manifold.
Figure 5-63.  Air Supply Manifold, Replace
Replace - TM-5-4220-227-14_325
Ball Valves Inch (Air Supply Manifold)
Figure 5-64.  Ball Valve 3/4 Inch, Replace
Repair.   - TM-5-4220-227-14_328
Figure 5-65.  Ball Valve 3/4 Inch, Repair
Repair.   (cont)
Ball Valves 1 Inch (Air Supply Manifold)
Figure 5-66.  Ball Valve 1 Inch, Replace
Repair. - TM-5-4220-227-14_333
Figure 5-67.  Ball Valve 1 Inch, Repair
Air Exhaust Manifold
Figure 5-68.  Air Exhaust Manifold, Replace
Ball Valves 1 1/4 Inch (Air Exhaust Manifold).
Figure 5-69.  Ball Valve 1 1/4 Inch, Replace
Repair. - TM-5-4220-227-14_339
Figure 5-70.  Ball Valve 1 1/4 Inch, Repair
Depth Gages
Figure 5-71.  Depth Gages, Replace
Replace - TM-5-4220-227-14_343
Caisson Gages
Figure 5-72.  Caisson Gages, Replace
CHAPTER 6 GENERAL SUPPORT MAINTENANCE INSTRUCTIONS - TM-5-4220-227-14_346
Section II.  GENERAL SUPPORT MAINTENANCE PROCEDURES
Inner/Outer Lock Door Assembly - TM-5-4220-227-14_348
Figure 6-1.  Inner/Outer Lock Door Assembly, Replace.
Inner/Outer Lock Door Assembly - TM-5-4220-227-14_350
Figure 6-2.  Inner/Outer Lock Door Assembly, Repair
Medical Lock Assembly
Figure 6-3.  Medical Lock Assembly, Repair
Calibration of Gages and Valves
View Port Assembly
Figure 6-4.  View Port Assembly, Replace
Repair. - TM-5-4220-227-14_357
Figure 6-5.  View Port Assembly, Repair.
Shell Penetrators.
Figure 6-6.  Electrical and Water Penetrator, Replace.
Replace Electrical and Water Penetrator.
Figure 6-7.  Oxygen Penetrator, Replace
Replace Electrical/02 Penetrator
Figure 6-8.  Electrical/O2 Penetrator, Replace
Replace Blank Penetrator.
Figure 6-9.  Blank Penetrator, Replace.
Figure 6-10.  Electrical and Water Penetrators, Repair.
Figure 6-11.  Oxygen Penetrator, Repair.
Figure 6-12.  Electrical/O2 Penetrator, Repair
PRESSURE RELIEF VALVE - TM-5-4220-227-14_371
Figure 6-14.  Pressure Relief Valve, Repair
Calibrate
Skid
Figure 6-15.  Skid, Repair
Heater/Chiller Module - TM-5-4220-227-14_376
Figure 6-16.  Heater/Chiller Module Flow Diagram
Figure 6-17.  Heater/Chiller Module Electrical Schematic
Replacement of heating element.
Figure 6-18.  Heater/Chiller Module, Repair (Sheet 1 of 3).
Figure 6-18.  Heater/Chiller Module, Repair (Sheet 2 of 3)
Figure 6-18.  Heater/Chiller Module, Repair (Sheet 3 of 3).
Condensing Unit Hermetic
Figure 6-19.  Condensing Unit Hermetic, Replace.
Repair. - TM-5-4220-227-14_385
Figure 6-20.  Condensing Unit Hermetic Fan Motor, Replace
Figure 6-21.  Condensing Unit Hermetic Condenser, Replace
Figure 6-22.  Condensing Unit Hermetic Receiver Tank, Replace.
Figure 6-23.  Condensing Unit Hermetic Compressor, Replace.
Figure 6-24.  Condensing Unit Hermetic Filter and Sight Glass Line, Replace
Low Pressure Control.
Figure 6-25.  Low Pressure Control, Replace.
Replace. - TM-5-4220-227-14_393
Control Box Assembly.
Figure 6-26.  Control Box, Replace
Control Box Assembly
Figure 6-27.  Control Box Electrical, Schematic
Replace toggle switch.
Figure 6-28.  Control Box, Repair
 Replace fuse block
Shroud Assembly
Figure 6-29.  Shroud Assembly, Replace
Pump Assembly
Figure 6-30.  Pump Assembly, Replace
Repair. - TM-5-4220-227-14_405
Figure 6-31.  Pump Assembly, Repair
High Temperature Control Unit
Figure 6-32.  High Temperature Control Unit, Replace.
Repair. - TM-5-4220-227-14_409
Figure 6-33.  High Temperature Control Unit, Repair
Low Temperature Control Unit
Figure 6-34.  Low Temperature Control Unit, Replace
Repair. - TM-5-4220-227-14_413
Figure 6-35.  Low Temperature Control Unit, Repair
Motor (CO2 Scrubber Assembly)
Figure 6-36.  Motor, Repair (Sheet 1 of 2)
Repair. - TM-5-4220-227-14_417
Figure 6-36.  Motor, Repair (Sheet 2 of 2)
Portable Oxygen Analyzer.
Figure 6-37.  Portable Oxygen Analyzer, Repair (Sheet 1 of 2)
Repair. - TM-5-4220-227-14_421
Figure 6-37.  Portable Oxygen Analyzer, Repair (Sheet 2 of 2)
Figure 6-38.  Portable Oxygen Analyzer, Schematic
Pressure Regulator - TM-5-4220-227-14_424
Figure 6-39.  Pressure Regulator, Repair
Repair. - TM-5-4220-227-14_426
Back Pressure Regulators
Figure 6-40.  Back Pressure Regulators, Repair
Repair - TM-5-4220-227-14_429
Oxygen Shutoff Valve
Figure 6-41.  Oxygen Shutoff Valve, Repair
Replace - TM-5-4220-227-14_432
Isolator Valve
Figure 6-42.  Isolator Valve, Repair
Demand and Exhaust Regulators
Figure 6-43.  Demand and Exhaust Regulators, Repair
Section III.  PREPARATION FOR STORAGE OR SHIPMENT
Government-Furnished Containers
Materiel Condition Tags
APPENDIX A REFERENCES - TM-5-4220-227-14_440
APPENDIX A REFERENCES (cont) - TM-5-4220-227-14_441
APPENDIX B MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_442
Column Entries - TM-5-4220-227-14_443
Tool and Test Equipment Requirements (Sect.  III and IV)
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_445
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_446
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_447
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_448
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_449
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_450
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_451
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_452
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-4220-227-14_453
Section IV.  REMARKS - TM-5-4220-227-14_454
APPENDIX C COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LISTS - TM-5-4220-227-14_455
Section II  COMPONENTS OF END ITEMS - TM-5-4220-227-14_456
Section II  COMPONENTS OF END ITEMS - TM-5-4220-227-14_457
Description - TM-5-4220-227-14_458
Section III.  BASIC ISSUE ITEMS - TM-5-4220-227-14_459
Section III.  BASIC ISSUE ITEMS (cont) - TM-5-4220-227-14_460
Section III.  BASIC ISSUE ITEMS (cont) - TM-5-4220-227-14_461
Section III.  BASIC ISSUE ITEMS (cont) - TM-5-4220-227-14_462
Description - TM-5-4220-227-14_463
Description - TM-5-4220-227-14_464
Description - TM-5-4220-227-14_465
APPENDIX D ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_466
Section II.  ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_467
Section II.  ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_468
Section II.  ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_469
Section II. ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_470
Section II. ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_471
Section II. ADDITIONAL AUTHORIZATION LIST - TM-5-4220-227-14_472
APPENDIX E EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST - TM-5-4220-227-14_473
DESCRIPTION - TM-5-4220-227-14_474
DESCRIPTION - TM-5-4220-227-14_475
APPENDIX F TORQUE LIMITS - TM-5-4220-227-14_476






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.