• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RECHARGE STATION NEEDLE VALVE
RELIEF VALVES

TM-5-4220-233-14 Trailer Mounted Type I Manifold Servicing Unit Trailer Mounted Type II Manifold Servicing Unit Oxygen Booster Pump Oxygen Charging Station Manual
Page Navigation
  108    109    110    111    112  113  114    115    116    117    118  
TM 5-4220-233-14 (1)   Disconnect tube assembly (1) from elbow (2) on valve (3) and from recharge station port fitting (4) and bag. (2)   Disconnect tubes on high pressure manifold (5) at all connection points. (3)   Loosen, but do not remove, screws (6) and nuts (7) on clamps (8) securing manifold (5) to control panel (9). (4)   Unsnap button plug (10) from handle (11) on valve (3) andremove nut (12) and handle (11) from valve (3). (5)   Remove retaining nut (13) from valve (3). (6)   Pull back on manifold tube (5) enough to allow valve (3) to be removed from back of control panel (9) and remove valve (3). (7)   Note position of elbow (2) on valve (3). (8)   Remove elbow (2) from side port of valve (3) and adaptor (14) from valve (3) and bag. b. Cleaning of Valve and Removed Components.  Refer to Section VII to clean elbow, adaptor, tube assembly and replacement valve as required. c. Installation. (1)   Apply anti-seizing tape (Item 16, Appendix D) to male pipe threads on elbow (2) and adaptor (14). (2)   Install adaptor (14) on valve (3). (3)   Install elbow (2) at side port of valve (3) and position as previously noted. (4)   Remove button plug (10), nut (12), handle (11), and retaining nut (13) from new valve (3). (5)   Insert valve (3) through back of control panel (9) and temporarily secure by installing retaining nut (13) hand tight. (6)   Connect, but do not tighten, all connectionsfor high pressure manifold tubes. (7)   Tighten screws (6) and nuts (7) on clamps (8) to secure manifold (5) to control panel (9). (8)   Connect tube assembly (1) to elbow (2) on valve (3) and to recharge station port fitting (4). (9)   Tighten all manifold tube (5) connections. (10)  Tighten retaining nut (13). (11)  Attach handle (11) to valve (3) with nut (12), then install button plug (10). (12)  Perform a leak check on all connections loosened during this task as prescribed in paragraph 4-20. 4-53







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.