• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SAFETY PROCEDURES PRIOR TO OPERATION OF THE COMPRESSED GAS SYSTEM
Figure 2-6.  Recharging Servicing Unit After Long Term Storage

TM-5-4220-233-14 Trailer Mounted Type I Manifold Servicing Unit Trailer Mounted Type II Manifold Servicing Unit Oxygen Booster Pump Oxygen Charging Station Manual
Page Navigation
  31    32    33    34    35  36  37    38    39    40    41  
TM 5-4220-233-14 2-6. COMPRESSED GAS SYSTEM OPERATION: RECHARGING STORAGE CYLINDERS AFTER LONG TERM STORAGE a. Preparing Servicing Unit for Recharge WARNING Care should be taken when working around high pressure air systems. Pressure should always be vented before hoses are connected or disconnected from the control panel.  Failure to follow this warning may result in personnel injury or death. Figure 2-5.  Preparing Servicing Unit for Recharge After Long Term Storage. (1)   Verify that Servicing Unit is properly set for operation per paragraph 2-4, Step e. and all Before PMCS has been completed for the Compressed Gas System (See Table 2-1, items 9 through 16). (2)   Open the front doors (1) to gain access to control panel. (3)   Verify that servicing valve, recharge valve, and all 1/4-turn ball valves on the control panel (2) are closed. (4)   Remove the side panels (3) from the Servicing Unit control compartment. (5)   Open the valve on each storage cylinder (4). 2-21







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.