• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fuel Injection Pump Solenoid.
Figure 4-37. Speed control linkage adjustment.

TM-5-4310-354-14 Compressor Rotary; Air Skid Mounted; Diesel Engine 125 CFM 100 PSIG (Davey Model 6M125) Manual
Page Navigation
  138    139    140    141    142  143  144    145    146    147    148  
TM 5-4310-354-14
Section XIX. MAINTENANCE OF SPEED CONTROL LINKAGE GROUP
The speed control linkage group
to air demand and output of the compressor. When the
4-73.
General.
consists of the speed control rod, idle control cable,
linkage is properly set, the compressor load and unload
compressor intake control lever, stop block, lever return
cycles, and the engine speed changes to suit the cycle,
spring, and the necessary attaching hardware for these
is automatic.
components. The speed control rod is attached to the
engine  fuel  injection  pump  throttle  lever.
This
4-74. Speed Control Linkage Adjustment. Adjust the
connection regulates the engine speed in direct relation
speed control linkage as shown in figure 4-37.
4-83






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.