• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECTION II.  REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT - TM-5-4310-385-13_28
Motor Starter Wiring Diagram

TM-5-4310-385-13 Compressor Reciprocating Air: Electric Motor Driven Caster Mounted 5 CFM 175 PSI C & H Model 20-917 Manual
Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
TM 5-4310-385-13 a. Before initial start-up, remove either oil fill plug (1) and fill crankcase with 10 oz.  (.3 L) of oil of proper viscosity. Refer to paragraph 3-2.  Replace fill plug. b. Check oil level on sightglass (2) before and after first operation. c. Remove the belt guard (3) and check V-belts (4) for proper tension.  Inspect the compressor flywheel and electric motor drive pulley for secure attachment to shafts. d. Before start-up, turn the flywheel over a few revolutions by hand to make sure that there aren't any obstructions anywhere in the unit. e. Inspect  the  intercooler  tubing  (5)  and  aftercooler  tubing  (6)  for  dents,  crimps,  and  secure  attachment.    Inspect compressor unloader line (7) to the pressure switch for crimping and secure attachment. f. Inspect air hose (8) for cuts or cracks or other signs of obvious damage.  Inspect the inflator gage (9) for secure attachment to air hose. g. Inspect all hardware for tightness, particularly for compressor unit and electric motor mountings. 3-8.  SITE AND SHELTER REQUIREMENT a. The  compressor  was  designed  for  permanent  installation  in  a  sheltered  environment.    Protect  the  compressor from water, excessive dirt and corrosive atmospheres. b. Compressor must be located in a clean, well ventilated dry place where compressor receives an adequate supply of  fresh,  clean,  cool  and  dry  air.    Allow  sufficient  space  around  the  compressor  so  that  it  is  accessible  from  all  sides  for maintenance. c. Locate   the   compressor   away   from   work   areas   and   areas   frequently   traveled,   preferably   outside   of   the maintenance building.  A special noise reduction enclosure may be necessary. d. Locate  the  compressor  where  appropriate  three  phase,  208  V  electrical  power  with  a  separate  ON/OFF  switch may be installed. e. For  proper  cooling,  insure  that  no  object  will  obstruct  the  flow  of  air  through  the  slotted  belt  guard  to  the  fan bladed flywheel. f. Compressor requires a space approximately 3' x 2' (1 m x .6 m).  Locate compressor at least 12" (30.5 cm) from any wall on a solid, level base. 3-9.  INSTALLATION INSTRUCTIONS. a. Compressor must be installed on a solid, level base.  If compressor is to be used as a portable unit, compressor can  be  left  bolted  to  bottom  skid.    Compressor  and  skid  must  be  placed  on  firm  level  ground  or  flooring  to  minimize vibration and ensure proper operation. CAUTION Do  not  eliminate  space  between  the  base  and  a  foot  by  drawing  the  foot  down. This  would  stress  the  tank  foot  and  result  in  abnormal  vibration  and  possible damage to the tank. b. For  permanent  installation,  bolt  the  compressor  securely  and  evenly  to  a  level  base.    If  flooring  or  base  is  not completely level, shims must be used under the feet. WARNING Power  must  be  shut  off  to  source  line  before  installation  service  is  performed. Voltages present in this equipment can cause injury or death. c. Connect the magnetic motor starter to 208 VAC 3 phase line with a separate ON/OFF switch. d. Before power is applied to unit, check all other wiring terminals in the starter enclosure and pressure switch for a secure fitting. 3-3







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.