• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Clutch Assembly (Cont). - TM-5-4310-386-14_480
APPENDIX B MAINTENANCE ALLOCATION CHART - TM-5-4310-386-14_482

TM-5-4310-386-14 Compressor Reciprocating Air: Electric Motor Driven & CFM 175 PSI C & H Model 20-918 Manual
Page Navigation
  462    463    464    465    466  467  468    469    470    471    472  
TM 5-4310-386-14 APPENDIX A REFERENCES A-1.   Scope.  This appendix contains all forms, lubrication orders, pamphlets and technical manuals referenced in this manual. A-2.  Forms. Equipment Inspection and Maintenance Worksheet .....................................................................DA Form 2404 Recommended Changes to Publications and Blank Forms........................................................... DA Form 2028-2 Transportation Discrepancy Report (TDR) .................................................................................... SF 361 Report of Discrepancy (ROD) ....................................................................................................... SF 364 Quality Deficiency Report (QDR) ..................................................................................................SF 368 Packaging Improvement Report) ..................................................................................................DD Form 6 A-3.  Pamphlets. The Army Maintenance Management System (TAMMS) . ............................................................. DA Pam 738-750 Consolidated Index of Army Publications and Blank Forms .......................................................... DA Pam 25-30 A-4.  Technical Manuals. Operator's Manual for Welding Theory and Application ................................................................ TM 9-237 Preservation, Packaging, and Packing of Military Supplies and Equipment...................................TM 38-230 Procedures for Destruction of Equipment to Prevent Enemy Use ................................................. TM 750-244-3 Repair Parts and Special Tools List for 20 CFM Compressor Unit................................................. TM 5-4310-386-24P A-5.  Technical Bulletins. Calibration Procedure for Pressure Gages used with Diving Equipment (General) ....................... TB 9-4220-216-35 Inspection and Test of Air and Other Gas Compressors................................................................ TB 43-0151 A-6.  Other Publications. Military Diving ................................................................................................................ FM 20-11-1 A-1/(A-2 blank)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.