• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III.  PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Section IV.  UNIT TROUBLESHOOTING PROCEDURES - TM-5-4310-387-14_52

TM-5-4310-387-14 Compressor Unit Diesel Engine Driven 20 CFM 3200 PSI Model K-20-D Manual
Page Navigation
  33    34    35    36    37  38  39    40    41    42    43  
TM 5-4310-387-14 Table 4-1.  Unit Preventive Maintenance Checks and Services (PMCS) (Cont). W - Weekly M - Monthly H - Hourly A - Annually Interval Item No. W M H A Item to be Inspected. Procedures 1 Compressor Assembly (cont.) 5. Check Compressor assembly for loose or missing components.  Repair or replace damaged or missing components. 6. Service crankcase breather (para. 4-22). 7. Have compressor inspected and tested in accordance with TB 43-0151. 8. Have gages inspected, and calibrated in accordance with TB 9-4220-216-35. NOTE Calibrate every 540 days or whenever inaccuracies are noted.  Equipment is declined if calibration due date has expired. 9. Have air charging whip inspected and tested in accordance with FM 20-11-1. 2. Engine Assembly 1. Check engine for damaged or missing compo- nents.  Repair or replace damaged or missing components. 100 2. Change engine oil (para. 4-23). 3. Check fuel system for leaks. 250 · 4. Replace fuel filter (para. 4-24). 100 · 5. Service air cleaner assembly (para 4-26) 300 6. Service filter screen (para. 4-31). 250 7. Notify direct support maintenance to adjust engine valves Change 1 4-4







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.