• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
d.  INSTALLATION - TM-5-4310-452-14_262
AIR DISCHARGE TUBE ASSEMBLY REPLACEMENT (Con't) - TM-5-4310-452-14_264

TM-5-4310-452-14 Compressor Air: Rotary Screw 750 CFM 100 PSI Wheel-Mounted DED SULLIAR Model 750 DP Manual
Page Navigation
  250    251    252    253    254  255  256    257    258    259    260  
TM 5-4310-452-14 4-101.  AIR DISCHARGE TUBE ASSEMBLY REPLACEMENT, THIS TASK COVERS a.  Removal b.  Installation INITIAL SETUP Equipment Conditions: Materials/Parts: • Engine off. •  Two lockwashers • Left door assembly open. •  Two preformed packings • Access door assembly open. •  Two self-locking nuts • Batteries removed (see paragraph 4-57). •  Two self-locking screws • System air pressure relieved, Tools/Test Equipment: • General mechanic's tool kit a.  REMOVAL 1. Remove nut (2), lockwasher (3), and battery cable (4) from starter solenoid (5).  Discard lockwasher. 2. Remove 3 screws (25) from side baffle assembly (23). 3. Remove 3 screws (24) and nuts (20) from side baffle assembly (23) and front baffle assembly (1), Remove side baffle assembly and battery cable (4). 4. Remove 2 screws (21) from side baffle assembly (23). 5. Remove 2 self-locking screws (22) and nuts (6) from pipe cover (7) and gasket (8).  Discard self-locking screws and nuts. 6. Remove nut (17), lockwasher (18), and wire (19) from pressure transmitter (12).  Discard lockwasher. WARNING Ensure   that   system   air   pressure   is   relieved   before   removing   air   discharge   tube   assembly, Compressed air can cause serious injury to personnel. 7. Disconnect air discharge tube assembly (13) from elbow (9).  Remove elbow and preformed packing (10) from oil separator tank (11).  Discard preformed packing, 8. Remove pipe cover (7) and gasket (8) from air discharge tube assembly (13). 9. Disconnect air discharge tube assembly (13) from adapter (16).  Remove air discharge tube assembly. 10. Remove   adapter   (16)   and   preformed   packing   (14)   from   minimum   pressure   service   valve   (15).      Discard preformed packing. b.  INSTALLATION 1. Position air discharge tube assembly (13) in place and install gasket (8), pipe cover (7), and 2 new self-locking screws (22) and nuts (6). 2. Install elbow (9) and new preformed packing (10) in oil separator (11). 4-206







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.