• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
5-10.  CRANKSHAFT REPLACEMENT.
5-11.   FLYWHEEL  MAINTENANCE

TM-5-4310-452-14 Compressor Air: Rotary Screw 750 CFM 100 PSI Wheel-Mounted DED SULLIAR Model 750 DP Manual
Page Navigation
  285    286    287    288    289  290  291    292    293    294    295  
TM 5-4310-452-14 5-10.  CRANKSHAFT REPLACEMENT (Con't). NOTE •     Ensure  that  bushing  dowels  are installed. •     Ensure  that  ID  numbers  of  caps match those stamped in crankcase. 3. Install crankshaft bearing caps (7) and main bearing halves (2 and 5) on crankshaft (6). 4.    Install  thrust  bearing  halves  (1  and  3)  in  place  on rear main journal. 5. Position crankshaft (6) in place. 6. Install 4 bolts (9) and washers (10) in main bearing caps (7).  Tighten bolts (9) as specified in Appendix F. 7.    Remove  bolts  (9),  washers  (10),  and  2  crankshaft bearing   caps   (7).      Remove   crankshaft   (6),   thrust bearing  halves  (1  and  3),  main  bearing  halves  (2 and 5), and plastigage. 8. Check    thickness    of    plastigage    with    micrometer. Thickness   should   be   between   0.0019-0.0043   in. (0.05-0.11 mm). 9. Repeat  steps  2  through  6,  then  continue  with  step 10. 10.   Install   connecting   rod   bearing   caps   and   bearing sleeves (see paragraph 5-12). FOLLOW-ON TASKS: •   Install oil pump (see paragraph 5-17). •   Install oil pan (see paragraph 5-16). •   Install vibration damper and V-belt pulley    (see paragraph 5-9). TA505572 5-26







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.