• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
EXPLANATION OF COLUMNS IN TOOL AND TEST EQUIPMENT REQUIREMENTS,
SECTION II. MAINTENANCE ALLOCATION CHART FOR AIR COMPRESSOR ASSEMBLY (Cont) - TM-55-1905-223-24-80127

TM-55-1905-223-24-8 Air Compressor for Landing Craft Utility (LCU) Manual
Page Navigation
  113    114    115    116    117  118  119    120    121    122    123  
TM 55-1905-223-24-8
SECTION II. MAINTENANCE ALLOCATION CHART
FOR
AIR COMPRESSOR ASSEMBLY
MAINTENANCE LEVEL
TOOLS
MAINTENANCE
COMPONENT
GROUP
UNIT
INTERMEDIATE DEPOT
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIP
REMARKS
C
O
F
H
D
08
AIR COMPRESSOR
INSPECT
0.5
C, D, E
ASSEMBLY
TEST
0.2
SERVICE
0.8
ADJUST
0.3
E
REPLACE
5.0
1
REPAIR
0.4
1.0 12.0
1-10
OVERHAUL
*
A
0801
MOTOR, ALTERNATING
TEST
0.2
CURRENT
REPLACE
0.5
1, 2, 4
B
REPAIR
0.5
1.5
1, 2, 7, 8
080101
CONDUIT BOX
REPLACE
0.5
1, 2
F
ASSEMBLY
0802
HYDRAULIC UNLOADER
REPLACE
0.5
1, 5
B
ASSEMBLY
REPAIR
1.2
1
0803
CYLINDER BLOCK AND
TEST
0.2
HEAD ASSEMBLY
REPLACE
1.0
1, 3, 6
REPAIR
0.5
6.0
1, 3
080301
CYLINDER HEAD
REPLACE
0.6
1, 3
ASSEMBLY
REPAIR
0.5
1.0
1, 3
08030101 UNLOADER BODY
REPLACE
0.4
1, 3
ASSEMBLY
REPAIR
0.7
1
08030102 VALVE ASSEMBLY
REPLACE
0.5
1, 3
REPAIR
1.0
1
08030103 VALVE ASSEMBLY,
REPLACE
0.5
1, 3
COMPRESSOR
REPAIR
1.0
1
Change 3 B-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.