7.  ENGINE OVERHEATS
b.  Repair. - TM-9-4310-396-13_89

TM-9-4310-396-13 Air Compressor Portable 5 CFM Model PD32T5 Manual
Page Navigation
  73    74    75    76    77  78  79    80    81    82    83  
TM9-4310-396-13 Section VI - UNIT MAINTENANCE PROCEDURES 4-11 GENERAL INSTRUCTIONS. Maintenance instructions in this section will list resources required, personnel required, and equipment condition for the start of the procedure. NOTE Resources required are not listed unless they apply to this procedure.  Personnel required are listed only if the task requires more than one.  If "Personnel" is not listed, it means one person can do the task.  The normal standard equipment condition to start a maintenance task is engine stopped and at ambient temperature. MAINTENANCE OF COMPLETE TOP HOOD ASSEMBLY AND FRAME CONTROL PANEL 4-12.  REPLACE COMPLETE TOP HOOD ASSEMBLY AND FRAME CONTROL PANEL. This task covers: a.  Removal c.  Installation b.  Repair INITIAL SETUP Tools Equipment Conditions: General Mechanics Tool Kit Parking brake set, para.  3-8 Engine stopped, para.  2-6.8 Storage battery disconnected, para.  4-26 Tail gate open Inlet heater lid off Materials/Parts Personnel Tape, Adhesive (Appendix E, item 19) 2 persons for mechanical lifting Adhesive, Tube (Appendix E, item 16) 4 persons for manual lifting Insulation (Appendix E, item 11) Paint, Green (Appendix E, item 12) Nonmetallic Seal (P/N 02352) a.  Removal. (1) Remove nonmetallic seal (1, Figure 4-1) from frame control panel (2). (2) Remove flat machine screws (3). 4-16







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.