TM 5-4220-227-14
5-12. Chamber Instrument Panel and Hood Assembly (Cont).
(8)
Remove chamber instrument panel (22).
(9)
Install chamber instrument panel (22) and secure with four screws (21), washers (20) and nuts (19).
(10)
Install manifold tray (18) and angle (17) and secure with four screws (16), lockwashers (15) and nuts (14).
(11)
Install two screws (13), lockwashers (12) and nuts (11).
(12)
Install warning (9) and flow chart (10) data plates and secure with rivets (8).
(13)
Position hood assembly door (2) and secure with six bolts (7), lockwashers (6) and nuts (5).
(14)
Install two supports (3) and pins (4) in hood assembly door (2).
(15)
Remove two pins (4), supports (3), close hood assembly door (2) and secure with two latches (1).
FOLLOW-ON MAINTENANCE
(1) Install isolator valves (para. 5-34).
(2) Install shutoff valves (para. 5-33).
(3) Install back pressure regulator (para. 5-32).
(4) Install pressure regulator (para. 5-31).
(5) Install oxygen pressure gages (para. 5-30).
(6) Install depth gages (para. 5-46).
(7) Install fluorescent light assembly (para. 4-41).
(8) Reconnect external electrical power (para. 4-36).
5-24