TM 5-4220-227-14
Component
Index
Step
(Location)
No.
Procedure
Check
Note
1.
Primary Air System
NA
Depressurize system up to chamber.
2.
Secondary Air System
NA
Depressurize system up to chamber.
3.
ALP-001 (left side of
1
Shut
chamber)
4.
ALP-002 (left side of
2
Shut
chamber)
5.
ALP-004 (left side of
3
Wired open
chamber)
6.
ALP-005 (Console)
4
Shut
7.
ALP-006 (Console)
5
Shut
8.
ELP-007 (Console)
6
Shut
9.
ELP-008 (Console)
7
Shut
10.
ALP-009 (Console)
8
Shut
11.
ALP-010 (Console)
9
Shut
12.
ELP-011 (Console)
10
Shut
13.
ELP-012 (Console)
11
Shut
14.
ALP-013 (Console)
12
Shut
15.
ALP-014 (Console)
13
Shut
16.
ALP-015 (Console)
14
Shut
17.
ALP-016 (Console)
15
Shut
18.
OHL-024 (Console)
16
Shut
19.
Oxygen Bottle Valves
17
Shut
20.
OXH-036 (02 Banks)s)
18
Open until OGA-028 reads 0 PSIG
then shut
Figure 2-12. Shutdown Procedures Checklist (Sheet 1 of 7).
2-44