TM 5-4220-233-14
b.
Cleaning of Manifold and Removed Components. Refer to Section VII to clean end fitting on relief valve
and replacement manifold as required.
c.
Installation.
(1) Apply anti-seizing tape (Item 16, Appendix D) to male pipe threads on relief valve (10).
(2) Install relief valve (10) onto the manifold (1).
(3) Position manifold (1) onto backside of control panel (9) and temporarily secure by installing three
clamps (5) with attaching screws (6), washers (7), and nuts (8).
(4) Connect, but do not tighten, connections on manifold (1) to four fill station valves (2), servicing valve
(3), and bleed off valve (4).
(5) Tighten screws (6) and nuts (8) on clamps (5) to secure manifold (1) to control panel (9).
(6) Tighten all tube connections from manifold (1) to four fill stations (2), servicing valve (3), and bleed off
valve (4).
(7) Perform a leak check on all connections loosened during this task as prescribed In paragraph 4-20.
4-39