Army equipment. The rebuild operation includes the act of returning to zero those age measurement (hours/miles, etc.)
considered in classifying Army equipment/ components.
d. Column (4), Tools and Equipment. This column is provided for referencing by code the special tools and test
equipment, (see III) required to perform the maintenance functions (sec II).
e. Column (5), Remarks. This column is provided for referencing by code the remarks (sec IV) pertinent to the
maintenance functions.
Section II. MAINTENANCE ALLOCATION CHART
(1)
(2)
(3) )
(4)
(5)
(3
G
Assembly group
Maintnnancecfufunions s
etenan e nctction
Tools and
Remarks
Mai
R
equipment
O
A
B
C
D
E
F
G
H
I
J
K
U
C
P
A
O
I
S
L
I
R
V
R
N
N
E
A
I
N
E
R
E
E
U
S
R
D
A
B
S
P
E
R
B
M
P
T
V
J
L
R
T
L
P
H
U
B
E
E
I
U
I
A
A
A
A
A
I
E
C
S
C
S
G
T
L
C
I
U
L
R
T
T
E
T
N
E
L
E
R
L
D
01 GROUP, GUARD BELT
0101
Belt Guard
C
C
0.1
0.5
02 GROUP, ELECTRIC MOTOR
AND RELATED COMPONENTS
0201
Electric Motor
C
O
F
0.3
1.0
4.0
0202
Rotor
F
F
0.1
2.0
0203
Starter
F
F
0.1
1.0
0204
Pressure Switch
F
F
0.5
0.8
0.8
ASSEMBLY
0301
V-Belts (matched pair)
C
C
O
0.5
0.8
0.9
0302
C
O
O
F
H
0.3
4.1
1.5
4.0
8.0
0303
Valve, Pilot
C
O
0.3
0.5
0304
Filter, Inlet
C
O
0.3
0.2
0305
Rod Assembly
F
F
0.2
3.0
0306
Crankshaft
F
F
0.2
3.0
04 GROUP, RECEIVER
0401
Receiver, Air
C
C
O
0.2
0.2
0.2
B-2