TM 5-4310-377-13
3-7. INSTALLATION.
a. Install the compressor at least 24 inches from any wall.
b. Install the four screws and four was hers to secure the compressor unit to the floor.
c. Connect the electrical wiring to the motor starter box per the wiring diagram contained in paragraph 1-14.
3-8. PRELIMINARY SERVICING.
a.
Fill the crankcase with lubricating oil per the instructions contained in paragraph 3-2.
b.
Check the oil sight gage for proper oil level.
c.
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
3-9. GENERAL.
a.
The best way to maintain the air compressor is to inspect on a regular basis so minor faults can be discovered
and corrected before they result in serious damage, failure, or injury. This section contains systematic instructions
for inspection, adjustment, and correction of the compressor components to avoid costly repairs or major
breakdowns. This is Preventive Maintenance Checks and Services.
b.
All shortcomings will be reported on DA Form 2404, Equipment Inspection and Maintenance worksheet,
immediately after the PMCS and before taking corrective action. They will also be reported in the equipment log.
c.
Do your Before (B) PREVENTIVE MAINTENANCE before operation.
d.
Do your During (D) PREVENTIVE MAINTENANCE during operation.
e.
Do your After (A) PREVENTIVE MA INTENANCE after operation.
f.
Do your Weekly (W) PREVENTIVE MAINTENANCE once each week.
g.
Do your Monthly (M) PREVENTIVE MAINTENANCE once each month.
h.
Do your Quarterly (Q) PREVENTIVE MAINTENANCE once each quarter.
i.
If something doesn't work, troubleshoot it with the instructions in your manual or notify your supervisor.
3-4