TM 5-4310-379-145-19.Cylinder Head.This task covers:ReplaceINITIAL SETUPToolsEquipment ConditionGeneral Mechanic's Tool KitUpper water connection removed (para. 3-20).(NSN5180-00-177-7033)Injector control removed (para. 4-9)Wrench, Torque (NSN 5120-00-554-7292)Injectors removed (para. 4-9)Sled Gage (PN J 22273-01)Governor removed (para. 4-11)Injector Tube Kit (PN J 22525)Magnetic Crack Detector (NSN 6635-01-128-2676)Wrench, Torque (NSN 5120-00-554-7292)Materials/PartsCylinder HeadLifting Bracket GasketTape, Teflon (Item 25, Appendix D)Oil Seal GasketCylinder Head Gasketa.Remove. (figure 5-20)(1)Loosen fitting nut (1) and remove temperature sensor (2).(2)Loosen fitting nut (3) and remove fuel line (4).(3)Loosen two fitting nuts (5) and remove line (6).(4)Remove two bolts (7) and lockwashers (8) and remove upper valve operating mechanism (9) and three push rodseats (10).(5)Remove two bolts (11) and washers (12) and remove upper valve operating mechanism (13) and three push rodseats (14).(6)Connect lifting device to lifting eyes (15).(7)Remove six bolts (16) and remove cylinder head (17), gasket (18), and oil seal gasket (19).(8)Remove three bolts (20) and lockwashers (21) and remove rear lifting bracket (22) and gasket (23).(9)Remove three bolts (24) and lockwashers (25) and remove thermostat housing assembly (26) and gasket (27).(10)Remove two elbows (28).(11)Remove two valve cover studs (29).Change 1 5-64
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business