TM 5-4310-386-14
4-29. Engine Assembly (Cont).
(2)
Installation. (figure 4-36)
(a)
Install drive ring (1) and secure with eight screws (2) and lockwashers (3).
(b)
Install PTO and clutch assembly (4) and secure with 12 screws (5) and lockwashers (6).
(c)
Install engine (7) on inner frame (8) and secure with two bolts (9), lockwasher (10), and nut (11).
(d)
Install wire (12) on connector on alternator (13).
(e)
Install wire (14) and secure with washer (15) and nut (16).
(f)
Install wire (17) and secure with washer (18) and nut (19).
(g)
Install wire (20) and secure with lockwasher (21) and nut (22).
(h)
Install cover (23) on alternator (13) and tighten five screws (24).
(i)
Install wire (25) on starter (26) and secure with screw (27).
(j)
Install battery cable (28), wire (29) on starter (26) and secure with nut (30).
(k)
Install line (31) and tighten fitting nut (32).
(I)
Install line (33) and tighten screws (34) on clamp (35).
(m)
Install three wires (36) on shutdown device (37), and secure with two screws (38).
(n)
Install top frame bars (39) and (40) on outer frame (41) and secure with 18 washers (42), nine
lockwashers (43) and bolts (44).
(o)
Install washer (45), ground wire (46), washer (47), lockwashers (48), and bolts (49).
(p)
Install throttle control (50) on outer frame (41) and secure with two washers (51) and bolts (52).
FOLLOW-ON MAINTENANCE
(1)
Install fuel tank (para. 4-26).
(2)
Install compressor drive belts (para. 4-20).
(3)
Install top tray (para. 4-18).
(4)
Install engine V-belt guard (para. 4-15).
4-90