TM 5-4310-387-14
5-24. Safety Valve (Second Stage Valve Head).
This task covers:
a.
Replace
INITIAL SETUP
Tools
General Mechanic's Tools Kit (NSN 5180-00-177-7033)
Materials/Parts
Safety Valve
Rags, Wiping (Item 19, Appendix E)
Bags, Plastic (Item 3, Appendix E)
Tape, Pressure Sensitive (Item 22, Appendix E)
Replace. (figure 5-33)
WARNING
Cleanliness is imperative in maintaining and handling diving air system components. All tools
and parts must be kept free of oil, grease, rust, or other contamination in accordance with
Chapter 4, Section VI of this manual. Foreign substances within an assembly could result in
equipment failure and possible injury or death to personnel.
Ensure that all air lines and components removed or openings into the air system that provides
breathing air are covered with a plastic bag and secured with a rubber band or taped shut. Small
components should be stored in a plastic bag and sealed. Failure to do so will cause air system
to become contaminated and could result In Injury or death to the diver.
(1)
Remove safety valve (1) and seal (2).
(2)
Install new safety valve (1) and seal (2).
5-70