TM 5-4310-387-14
(10)
Install two spacers (21) and (22), connecting rods (20), (19), and (18) on crankshaft (12) in the orientation
noted during removal.
(11)
Install balance weight (17) and secure with bolt (16), washer (15), and nut(14).
(12)
Install new bearing (13) on crankshaft (12).
(13)
Install crankshaft (12).
(14)
Install housing (10) and new preformed packing (11) and secure with six screws (8) and washers (9).
(15)
Install oil pump cam (7) and secure with plate (6) and two screws (5).
(16)
Install new gasket (4) and note (3) and secure with four screws (1) and washers (2).
FOLLOW-ON MAINTENANCE
(1) Install third stage crosshead assembly (para. 6-13).
(2) Install second stage piston assembly (para. 6-11).
(3) Install first stage piston assembly (para. 6-9).
6-37