TM 5-4310-451-14
4-86. AIR CLEANER SUPPORTS REPLACEMENT.
This Task Covers:
a.
REMOVAL
b.
INSTALLATION
Initial Setup:
Equipment Conditions
Materials/Parts:
Air cleaners removed (see paragraphs 4-31 and
Four locknuts
4-102).
Tools/Test Equipment:
Personnel Required: Two
General mechanic's tool kit
NOTE
Both air cleaner supports are removed same way. This procedure covers one support.
Remove four locknuts (3), screws (2), and air
cleaner support (4) from top center panel (1).
Discard locknuts.
NOTE
Both air cleaner supports are Installed same way. This procedure covers one support.
Install air cleaner support (4) on top center panel (1) with four screws (2) and new locknuts (3).
FOLLOW-ON TASKS:
Install air cleaners (see paragraphs 4-31 and 4-102).
TA704854
a. REMOVAL
b. INSTALLATION
4-202