agreements are made between the
Companies, Direct Support (TOE 5-237),
Commander of the designated Engineer
and similar TOE units to provide 3d
Parts Supply Activity, normally Direct
echelon
maintenance
for
Mobility
Support Units (DSU) and using unit. Parts
Command equipment and to provide
so furnished are in addition to the
organizational maintenance repair parts
prescribed load and will be adjusted as
for supported units for a 15-day period.
demands indicate.
Additional repair parts are allocated by an
asterisk for immediate use only. Upon
(4) Units with TOE Mission to provide
establishment of supply records, recorded
maintenance for Mobility Command
demand experience will be used to
equipment of supported units.
Units
compute
stockage
objectives
on
organized under TOE's such as 5-214 and
authorized repair parts.
Review of
5-500 with the assigned mission to
stockage objectives will be performed in
provide field maintenance for Mobility
the time cycle prescribed by major
Command equipment of supported units
commanders. Repair parts allocated for
are authorized to stock 3d and 4th
immediate use only may be stocked when
echelon repair parts. These repair parts
demand experience indicates a stockage
will be issued from the appropriate parts
of at least one.
supply activity (parts depot and/'or DSU).
Such stockage is in addition to the
(2) Fourth echelon. This column lists initial
prescribed load and will be adjusted as
guide quantity allocation factors of repair
demands indicate.
parts authorized for initial stockage by
Engineer Field Maintenance Shops (non-
h. Depot Maintenance, 5th Echelon. This column
TOE), Engineer Heavy Maintenance
lists the quantity of repair parts recommended for
Companies (TOE 5-278), and similar TOE
Engineer Depot Maintenance Shops (non-TOE) to
units to provide 4th echelon maintenance
provide depot maintenance for 100 equipments.
for Mobility Command equipment for a
Additional repair parts are allocated by an asterisk, for
15day period. Additional repair parts are
immediate use only.
Explanation of the asterisk
allocated by an asterisk for immediate use
allowance is contained in f above.
only.
Upon establishment of supply
i. Illustrations. This column is subdivided into two
records, recorded demand experience will
columns as follows:
be used to compute stockage objectives
(1) Figure number. Indicates the number of
on authorized repair parts. Review of the
the illustration in which the part is shown.
stockage objectives will be performed in
(2) Item number. Indicates the reference
the time cycle prescribed by major
number used to point out the part in the
commanders. Repair parts allocated for
illustration.
immediate use only may be stocked when
demand experience indicates a stockage
objective of at least one.
3. Federal Stock Numbers and Manufacturers'
(3) Units with TOE capability of performing
Part Numbers
partial or complete field maintenance for
Listed alpha-numerically in the back of this
organic Mobility Command equipment.
manual are the requisitioning numbers shown in the
Units organized under TOE's 5-114, 5-
Federal Stock Number and/or description column. The
115, 5-117, 5129, and similar TOE's with
alphabetical 0 is listed as a numerical 0 (zero). This
the TOE capability of performing partial or
index also lists manufacturers' codes (as applicable) and
complete field maintenance for organic
page numbers.
Mobility Command equipment
will be authorized to stock 3d and/or 4th
echelon Repair parts only when specific
vi