TM 5-4220-227-14
4-16. Electrical Connections.
a.
110 Volt Power Cable. Connect GFI power cables to 110 VAC, 20 Amp, 60 Hertz external power source.
Connect the SPRPM directly to the GFI. Connect the following components to the power strip:
(1)
Hyperbolic Light Assembly Power Supply.
(2)
Direct Current Power Supply.
(3)
Oxygen Analyzer.
(4)
Communications Box
(5)
Digital Thermometer.
(6)
Overhead panel fluorescent light.
b.
220 VAC Power Cable and 110 VAC. Connect the 220 VAC, 20 Amp, and, if applicable, the 110 VAC, 20 Amp
power cables to the heater/chiller module.
Section III. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Paragraph
Page
4-17
General .........................................................................................................................................4-7
4-18
PMCS Procedures ........................................................................................................................4-7
4-17. General. To ensure that the 3-Person Recompression Chamber is always ready for operation, it must be inspected
so that any defects can be discovered and corrected before they result in damage or failure. Regular inspection will
ensure the 3-Person Recompression Chamber is fully operational and reliable.
a.
Weekly (W) PMCS shall be performed once each week.
b.
Monthly (M) PMCS shall be performed once each month.
c.
Yearly (Y) PMCS shall be performed once each year.
d.
If Your Equipment Fails to Operate. Troubleshoot with proper equipment. Report deficiencies using the proper
forms See DA PAM 738-750.
4-18. Preventive Maintenance Checks and Services Procedures. Table 4-1 describes preventive maintenance
required for the 3-Person Recompression chamber. Table 4-1 consists of five columns, containing the following
a.
Item Number. Checks and services are numbered in order of performance. These numbers will be used in the
TM Number Column on DA Form 2404 (Equipment Inspection and Maintenance Worksheet) when recording results of
preventive maintenance checks and services.
b.
Interval. The columns headed W, M, and Y contain dots () opposite the proper checks.
4-7