TM 5-4220-233-14
(1) Remove relief valve (1) from high or low pressure manifold (2) and bag.
b.
Cleaning of Relief Valve. Refer to Section VII to clean replacement relief valve as required.
c.
Installation.
(1) Apply anti-seizing tape (Item 16, Appendix D) to male pipe threads on relief valve (1).
(2) Install relief valve (1) onto high or low pressure manifold (2).
(3) Perform a leak check on relief valve to manifold connection as prescribed in paragraph 4-20.
4-55