TM 5-4220-233-14
(1) Refer to Figure 5-2. Install brake lines (2) onto new axle (14) and secure with four clamps (23) and
screws (22)
(2) Secure T" fitting (5) to axle (14) with screw (20) and washer (21).
(3) Position axle (14) under springs (16)and raise with floor jacks until locating pins on springs are
engaged with holes in top of axle.
(4) Attach axle (14) to spring (16) and plate and stud assembly (19) by installing two "U" bolts (17), and
four nuts (17).
(5) Repeat step 4 for other side of axle (14).
(6) Remove floor jacks from under axle (14).
(7) Position brake assembly (1) on axle and secure with five screws (11), nuts (12) and washers (13)
(8) Repeat step 7 for other brake assembly (3).
(9) Insert brake cable onto cable holder (10) and tighten jam nuts.
(10)
Install yoke (9), clevis pin (8) washer (7), and cotter pin (6) onto shaft lever.
(11)
Repeat steps 9 and 10 for other brake cable assembly
(12)
Connect brake hose (4) to "T fitting (5).
(13)
Connect brake line (2) to backside of brake assembly (1).
(14)
Repeat step 13 for other brake assembly (3).
(15)
Install new shock absorbers as prescribed in paragraph 4-45
(16)
Reinstall hub and drum assemblies as prescribed in paragraph 4-42
(17) Bleed and service brake system as prescribed in paragraph 4-47.
5-4