TM 5-4310-371-14
CHAPTER 4
ORGANIZATIONAL MAINTENANCE
Section I. PREPARATION FOR STORAGE OR SHIPMENT
4-1. UNLOADING AND UNPACKAGING. The total weight of the compressor unit is 830 pounds (376 kg). You must use
a fork lift of 1000 pounds (453 kg) capacity to unload compressor unit. Keep compressor unit flat during the unloading
operation. Before unpacking, place compressor unit in the location where it is to be installed. Remove the packaging
material carefully so you do not damage the contents with the tools used for unpackaging.
4-2. INSTALLATION.
a. Place in desired position, making sure to keep compressor unit level.
b. For wiring ins tructions of starter switch and main power supply disconnect, see Figure 4-1.
Wiring must be
installed by a qualified electrician.
NOTES:
1.
NAMEPLATE ON MOTOR INDICATES
WHICH MOTOR LEADS SHOULD BE
CONNECTED WITH T1 T2, AND T3 FOR
PROPER OPERATION.
2.
TERMINALS NO. 1 NO 2 AND NO. 3 ARE
CONTROL
TERMINAL
ON
THE
STARTER.
TM 5-4310-371-14/4-1
FIGURE 4-1. WIRING DIAGRAM
4-1