ItemIntervalNo.WMQItem To Be Inspected. ProceduresTM 5-4310-385-13Table 3-2. Unit Preventive Maintenance Checks and Services (Continued).W - WeeklyM - MonthlyQ - Quarterly2PRESSURE SWITCHa.Inspect pressure switch fitting (1) at tank for air leaks.b.Turn power off and ON/OFF switch off. Check wireconnections at screw terminals (2) for secure attachment.c.With power on and ON/OFF switch on, check operationof pressure switch (3) by observing pressure gauge while depressinginflator gauge lever. Pressure switch should engagestarter at 160 psi and stop starter at 190 psi.3COMPRESSOR DRIVEa.Inspect belt guard mounting screws (1). Remove screws andbelt guard (2).b.Inspect belt guard mounting bolts (3) to tank saddle.c.Inspect V-belts (4) for cracks or signs of wear.d.Inspect drive pulley (5) for secure attachment to motor shaft. Checkkey and bushing capscrews (6) for tightness.3-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business