TM 5-4310-385-13
b.
Open drain cock (2) and completely release tank pressure.
c.
Remove belt guard (3). Refer to paragraph 3-23.
d. Remove motor starter and enclosure (4). Refer to paragraphs 3-19 and 3-20.
e.
Remove electric motor (5). Refer to paragraph 3-33.
f.
Remove tubing assemblies (6). Refer to paragraphs 3-31 and 3-44.
g.
Remove compressor unit (7). Refer to paragraph 3-27.
h.
Remove pressure switch (8). Refer to paragraph 3-21.
i.
Remove safety valve (9). Refer to paragraph 3-35.
j.
Remove check valve (10). Refer to paragraph 3-36.
k.
Remove pressure gauge (11 ). Refer to paragraph 3-37.
I.
Remove drain cock (2). Refer to paragraph 3-38.
m.
Remove shutoff valve (12). Refer to paragraph 3-39.
n.
Unbolt tank (13) from base.
INSTALLATION.
a.
Bolt air tank (13) to base. Make sure base is on firm level ground or flooring.
b.
Install shutoff valve (12). Refer to paragraph 3-39.
c.
Install drain cock (2). Refer to paragraph 3-38.
d.
Install pressure gage (11 ). Refer to paragraph 3-37.
e.
Install check valve (10). Refer to paragraph 3-36.
f.
Install safety valve (9). Refer to paragraph 3-35.
g.
Install pressure switch (8). Refer to paragraph 3-21.
h.
Install compressor unit (7). Refer to paragraph 3-27.
i.
Install tubing assemblies (6). Refer to paragraphs 3-31 and 3-44.
j.
Install electric motor (5). Refer to paragraph 3-33.
k.
Adjust belt tension (paragraph 3-24) and pulley alignment (paragraph 3-25).
I.
Install motor starter and enclosure (4). Refer to paragraphs 3-19 and 3-20.
m.
Install belt guard (3). Refer to paragraph 3-23.
n.
Close drain cock (2).
CAUTION
Before operating compressor, be sure all components and fittings are secure and
tight. Also, check that wiring is correct. Check that tools and objects are clear of
unit.
o.
Connect main power.
p.
Turn power switch (1) on and run compressor. Inspect entire unit, check for air leaks and perform operational
check.
3-54