TM 5-4310-386-14
5-8. Controls and Indicators.
This task covers:
a.
Replace
INITIAL SETUP
Tools
Materials/Parts (Cont.)
General Mechanics Tool Kit
Tape, Teflon (Item 26, Appendix E)
(NSN 5180-00-177-7033)
Tape (Item 25, Appendix E)
Materials/Parts
Equipment Condition
Service Line Pressure Gage
Compressor unit shut down (para. 2-13)
Pressure Gage
Oil Pressure Gage
Reference
Service Line Control Valve
Service Outlet Valve
Cleaning procedures, Chapter 4, Section VII
Band, Rubber (Item 4, Appendix E)
Replace. (figure 5-3)
WARNING
Cleanliness is imperative in maintaining and handling diving system components. All tools and
parts must be kept free of oil, grease, rust, or other contamination in accordance Chapter 4,
Section VII of this manual. Foreign substances within an assembly could result in equipment
failure and possible injury or death to personnel.
Ensure that all air lines and components removed or openings into the air system that provides
breathing air are covered with a plastic bag and secured with a rubber band or taped shut. Small
components should be stored in a plastic bag and sealed. Failure to do so will cause air system
to become contaminated and could result in injury or death to the diver.
(1) Service line control valve. (figure 5-3)
(a) Loosen fitting nut (1) and remove line (2).
(b) Loosen fitting nut (3) and remove line (4).
(c) Loosen fitting nut (5) and remove line (6).
(d) Remove knob (7) and nut (8), and remove control valve (9) from control panel (10).
(e) Remove tee (11) from fitting (12) and elbow (13).
5-14