TM 5-4310-387-14
5-39. Frame.
This task covers:
a.
Replace
b.
Repair
INITIAL SETUP
Tools
Equipment Condition
General Mechanic's Tools Kit (NSN 5180-00-177-7033)
Storage tray removed (para 4-15).
Gage panel removed (para 5-8).
Equipment Condition (Cont)
Shock mounts removed (para 4-34).
Purifier assembly removed (para 5-9).
Compressor removed (para 5-10).
Cold start system removed (para 4-32)
Engine removed (para 4-23)
Pressure maintaining valve removed (para 5-37).
a. Replace. (figure 5-54)
(1)
Remove three screws (1), washers (2), and guard (3).
(2)
Remove two nuts (4) and bolt (5).
(3)
Remove four nuts (6), washers (7), and compressor mounting bracket (8).
(4)
Remove four studs (9).
(5)
Remove two screws (10), washers (11), and bracket (12).
(6)
Install bracket (12) on new frame (13) and secure with two screws (10) and washers (11).
(7)
Install four studs (9) on new frame (13).
(8)
Install compressor mounting bracket (8) on new frame (13) and secure with four washers (7), and nuts (6).
(9)
Install bolt (5) and two nuts (4).
(10)
Install guard (3) on new frame (15) and secure with three screws (1) and washers (2).
5-120