TM 5-4310-451-14
4-45. OIL COOLER ELBOW AND HOSE REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
áCoolant drained (see Lubrication Instructions, Chap-
áOne gasket
ter 3, Section I)
áThree lockwashers
Tools/Test Equipment:
áGeneral mechanics tool kit
a. REMOVALI
1.
Loosen two clamps (3).
2.
Remove hose (4) and two clamps (3) from water pump (1) and elbow (5).
3.
Remove three bolts (6), lockwashers (7), elbow (5), and gasket (8) from oil cooler (9). Discard lockwashers and
gasket.
4.
Remove two plugs (2) from elbow (5).
TA704759
4-85