TM 5-4310-451-14
4-49. THERMOSTAT, THERMOSTAT COVERS, WATER OUTLET, AND CROSSOVER TUBE
REPLACEMENT (Cont).
10.
Install temperature gage line (45) and bushing (44) on right water outlet (48).
11.
Install cold start valve (47) on right water outlet (48).
12.
Position three wires (42 and 46) on cold start valve (47) and tighten two screws (43).
13.
Install two plugs (38) In left water outlet (31).
14.
Apply adhesive to new gasket (33) and install on
left water outlet (31).
15.
Install left water outlet (31) with new lockwasher
(40) and bolt (41).
16.
Install new lockwasher (37) and bolt (39) on left
water outlet (31).
17.
Install new lockwasher (34), washer (35), and
bolt (36) on left water outlet (31).
4-102