TM 5-4310-452-14
4-34. COWLING, DUCT, GUIDE RAIL, SHIELD, AND PLATE REPLACEMENT (Con't).
5.
Install 2 bolts (30 and 40), new lockwashers (32 and 39), flatwashers (33 and 38), and nut (34) in stay plate (37).
6.
Position plate (16) in place and install 3 bolts (13, 19, and 29), new lockwashers (14, 18, and 28), flatwashers (15, 17,
and 27), and nut (23).
7.
Position shield (9) in place and install 3 bolts (12), new lockwashers (11), and flatwashers (10).
8.
Install 4 bolts (20), new lockwashers (21), and flatwashers (22) in stay plate (37), plate (16), and shield (9).
9. Position guide rail (6) in place and install 8 bolts (7), and new lockwashers (8). Install duct (5) and close fasteners (4).
FOLLOW-ON TASKS:
Install fuel lines (see paragraph 4-24).
Install blower assembly (see paragraph 4-32).
Connect battery cables (see paragraph 4-57).
Close left door assembly.
TA505458
4-66