TM 9-4310-397-14
SECTION VI MAINTENANCE PROCEDURES
4-30. EXHAUST MUFFLER. PIPING AND RISER REPLACEMENT .
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools:
Equipment Conditions:
General Mechanics Tool Kit
Curbside doors open.
Item 1, Section III, Appendix B
Battery cables disconnected from batteries.
(See para 4-49.)
a.
Removal.
(1)
Remove four self locking nuts (1), pan head screws (2), flat washers (3), and muffler shroud (4). Discard
self locking nuts.
Figure 4-9. Muffler Shroud
(2)
Remove four hex nuts (Figure 4-10, 1), two U bolts (2), and saddles (3).
4-65