TM 5-4310-393-14Pressure Purged From SystemA Check.1. Checking the Interstage Pressure Readings.a. Remove dust from test port connectors with a lint-free cloth.b. Remove tube plugs and install appropriate pressure gauges in test ports.c. Operate the unit and observe pressure readings should be approximately 56 psi (4 bar) at first stage,50b0 psi (35 bar) at 2nd stage.d.If pressures are incorrect refer to Unit Troubleshooting Section IVB Install.1.Installing the Tube Plugs.a.Remove test gauges and reinstall tube plugs.C Test.1. Testing the Interstage Connections.a.Leak test with detergent/water solution .4-20. TUBING AND FITTINGS.This task covers: A. Replace B TestTools:Materials/Parts:Cloth, Lint-free NSN 7920-00-044-9281Detergent, Non-ionic NSN 7930-00-282-9699Tape, Teflon NSN 8030-00- 889-3534Water, Distilled NSN 6810-00-297-9540Equipment Conditions:Unit Shut DownPressure Purged From SystemA Replace1.Replacing Tubing and Fittings.a.Remove dust with lint-free cloth from tube connections.b. Unscrew tube nuts/fittings of defective tube.c.Install new tube or fittings, use Teflon tape on pipe threads.B. Test.1.Testing Tube Connectionsa.Leak test with detergent/water solution.4-32
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business