TM 5-4220-227-14
Component
Index
Step
(Location)
No.
Procedure
Check
Note
1.
Primary Air System
NA
Pressurize system up to recompression
chamber
2.
Secondary Air System
NA
Pressurize system up to recompression
chamber
3.
ALP-001 (Console)
1
Open
4.
ALP-002 (Console)
2
Shut
5.
AGA-003 (Console)
3
Ensure air supply system pressure is
acceptable (minimum 150 PSIG)
6.
ALP-004 (Console))
4
Ensure relief gag valve is wired open
with warning per FM 20-11-1
7.
ALP-013 (Console)
5
Open
8.
ALP-014 (Console)
6
Open
9.
ALP-015 (Console)
7
Open
10.
ALP-016 (Console)
8
Open
11.
AGA-017 (Console)
9
Zero gage
12.
AGA-018 (Console)
10
Zero gage
13.
AGA-019 (Console)
11
Zero gage
14.
OXH-030 through OXH-035
12
Shut
through
17
15.
02 Bottle Valves
18
Open
16.
OXH-030 02 Bank #1
12
Open
17.
OXH-031 (O2 Bank #1)
13
Open
18.
OXH-032 (02 Bank #1)
14
Open
19.
OXH-027 (02 Bank)
15
Open and record bank #1 pressure from
OGA-028 (19) here
Figure 2-10. System Startup Checklist (Sheet 1 of 11).