TM 5-4310-227-34P
INTRODUCTION
columns in the tabular lists in Sections
1. Scope
II and III:
a. This manual lists repair parts, special
a. Source, Maintenance, and Recover-
tools, test and support equipment required
ability Code (SMR).
f o r the performance of direct support,
(1) Source code. Indicates the source
general support, and depot maintenance of
f o r the listed items. Source codes are:
b. Repair parts listed represent those
Explanation
Code
authorized for use at indicated maintenance
Repair parts, special tools, and test equipment
P
l e v e l s and will be requisitioned on an
supplied from GSA/DSA, or Army supply
" a s required" b a s i s until stockage is
system, and authorized for use at indicated
justified by demand in accordance with
maintenance levels.
AR 710-2.
Repair parts, special tools, and test equipment
P2
purposes because combat or military es-
2. General
sentiality of the end item dictates that a
This repair parts and special tools list
minimum quantity be available in the supply
system.
is divided into the following sections:
Repair parts, special tools, and test equip-
M
a. Repair Parts - Section II. A list,
ment which are not procured or stocked, as
in figure and item number sequence, of
such, in the supply system but are to be
repair parts authorized for the perform-
manufactured at indicated maintenance levels.
ance of maintenance at the direct support,
Assemblies which are not procured or stocked
A
as such, but are made up of two or more
general support, and depot level, including
units. Such component units carry individual
those items which must be removed for
stock numbers and descriptions, are procured
replacement of the authorized item. Items,
and stocked separately and can be assembled
except kits and sets, are listed by assembly
to form the required assembly at indicated
group sequence. Repair parts kits and sets
maintenance levels.
X
Parts and assemblies that are not procured
a r e listed separately at the end of the
or stocked because the failure rate is normal-
assembly group to which they belong. Com-
ly below that of the applicable end item or
ponents of the kits and sets are listed in
component. The failure of such part or as-
t h e i r proper sequence in the assembly
sembly should result in retirement of the end
group to which they belong and are ref-
item from the supply system.
X1
Repair parts which are not procured or stocked.
e r e n c e d to the FSN of the kit or set.
The requirement for such items will be filled
b. Special Tools, Test and Support Equip-
by the next higher assembly or component.
ment - Section III. A list of special tools,
Repair parts, special tools, and test equipment
X2
test and support equipment authorized for
which are not stocked and have no foreseen
t h e performance of maintenance at the
mortality. The indicated maintenance level
requiring such repair parts will attempt to
direct support, general support, and depot
obtain the parts through cannibalization or
level. (Not applicable)
salvage, if not obtainable through cannibal-
c. Federal Stock Number and Reference
ization or salvage, the item may be requisi-
Number Index - S e c t i o n IV. A list of
tioned with exception data, from the end item
Federal stock numbers in ascending
manager, for immediate use.
Major assemblies that are procured with PEMA
numerical sequence followed by a list of
G
funds for initial issue only as exchange as-
r e f e r e n c e numbers in ascending alpha-
semblies at DSU and GSU level. These as-
numeric sequence, cross-referenced to the
semblies will not be "stocked above the DS
illustration figure number and item num-
and GS level or returned to depot supply level.
ber.
NOTE
Cannibalization or salvage may
be used as
a source of supply for any items
source coded
3. Explanation of Columns
above except those coded X1
and aircraft
The following provides an explanation of
support items as restricted by
AR 700-42.