Table C-2. Organizational Preventive Maintenance Checks
and Services
Q - Quarterly
Total man-hours required: 2.0
Sequence
Work
Number
ITEM TO BE INSPECTED
Time
PROCEDURE
(M/H)
1
Air Hose Refer to table C-J
0.1
2
Electrical Conduit Refer to table C-I
0,1
3
0.1
Refer to table C-l.
4
Belt Guard Refer to table C-l
0.1
5
V Belts Inspect for worn, frayed, or
0.1
cracked belts. Check for Improper tension,
adjustment and alignment. Refer to Section
X, paragraph E3
for adjustment, alinement,
and proper tension of V belts.
6
Pulley Refer to Table C-l
0.1
7
Globe Valve. Refer to table C-I
0.1
8
Drain Cock Refer to table C-l
0.1
9
Air Pressure Gage Refer to table C-l
0.1
10
Safety Relief Valve Refer to table C-I
0.1
11
Air Intake Muffler Refer to table C-I
0.1
12
Air Filter Refer to table C-l
0.1
13
0.1
14
Regulator Refer to table C-I
0.1
15
Air Receiver Refer to table C-l
0.1
16
Unloader Valve Inspect for dents,
0.1
stripped threads, and Improper mounting.
Check for dirt and foreign matter clogging
valve. If necessary, clean all parts with
cleaning solvent and dry thoroughly.
C-4