TM 5-4310-368-14
(3)
Install all parts removed for service.
(4)
Install float valve and seal.
(5)
Install float and pivot pin.
(6)
(7)
Install throttle body onto bowl.
(8)
Install and secure screws.
5-13.
This task covers:
a. Disassembly
c.
Inspection
b. Cleaning
d. Reassembly
INITIAL SETUP
Applicable Configurations
All
Equipment Condition
Paragraph
Condition Description
Fuel Pump Removed
General Safety Precautions
WARNING
Dry cleaning solvent, P-D-680, used to clean parts is potentially
dangerous to personnel and property. Avoid repeated and prolonged
skin contact. Do not use near open flame or excessive heat. Flash
point of solvent is 100 (38 ) - 138 (59 ).
F
C
F
C
a. Disassembly
(1)
File a groove across a point at the union of castings. This is a positive location of the fuel INLET and
OUTLET positions when reassembling. Remove six head to flange screws and remove fuel head. Take
off screw, remove cover and discard cover gasket.
(2)
Turn fuel head over and remove both valve assemblies and gaskets. Note position of valves.
(3)
Insert the end of a small screwdriver into the coils of rocker arm spring and remove.
5-25