TM 5-4310-379-14
5-25. Power Take-Off Assembly.
This task covers:
Repair
INITIAL SETUP:
Tools
Equipment Condition
General Mechanic's Tool Kit
(NSN 5180-00-177-7033)
Power take-off removed (para. 4-22). Puller Kit,
Mechanical (NSN 5120-00-033-5606)
Materials/Parts
Solvent, dry cleaning (Item 23, Appendix D)
Rags, Wiping (Item 21, Appendix D)
Repair. (figure 5-32)
(1)
Remove pilot bearing (1).
(2)
Loosen fitting nut (2) and remove grease line (3) from clutch assembly (4).
(3)
Bend lockwasher (5) away from nut (6) and remove nut (6), lockwasher (5), clutch assembly (4) and drive
key (7).
(4)
Loosen bolt (8) and remove handle (9).
(5)
Loosen two bolts (10) and slide yoke (11) to left or right and remove two keys (12) and (13) and remove
shaft (14) and yoke (11).
(6)
Remove screw (15) and lockwasher (16) and remove lock (17).
(7)
Remove bearing retainer (18) and bearing cup (19).
(8)
Remove output shaft (20) with bearings (21) and (22) installed.
NOTE
There are 3 holes at rear of housing for removal of inner bearing cup. Insert a punch in houses
and tap alternately at three points to remove inner bearing cup.
(9)
Remove inner bearing cup (23).
5-106