TM 5-4310-379-145-25. Power Take-Off Assembly.This task covers: RepairINITIAL SETUP:Tools Equipment ConditionGeneral Mechanic's Tool Kit(NSN 5180-00-177-7033)Power take-off removed (para. 4-22). Puller Kit,Mechanical (NSN 5120-00-033-5606)Materials/PartsSolvent, dry cleaning (Item 23, Appendix D)Rags, Wiping (Item 21, Appendix D)Repair. (figure 5-32)(1)Remove pilot bearing (1).(2)Loosen fitting nut (2) and remove grease line (3) from clutch assembly (4).(3)Bend lockwasher (5) away from nut (6) and remove nut (6), lockwasher (5), clutch assembly (4) and drivekey (7).(4)Loosen bolt (8) and remove handle (9).(5)Loosen two bolts (10) and slide yoke (11) to left or right and remove two keys (12) and (13) and removeshaft (14) and yoke (11).(6)Remove screw (15) and lockwasher (16) and remove lock (17).(7)Remove bearing retainer (18) and bearing cup (19).(8)Remove output shaft (20) with bearings (21) and (22) installed.NOTEThere are 3 holes at rear of housing for removal of inner bearing cup. Insert a punch in housesand tap alternately at three points to remove inner bearing cup.(9)Remove inner bearing cup (23).5-106
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business