TM 5-4310-380-13
3-7. INSTALLATION.
a. Install the compressor at least 24 inches from any wall.
b. Install the four screws and four washers to secure the compressor unit to the floor.
c. Connect the electrical wiring to the motor starter box per the wiring diagram contained in paragraph 1-14.
3-8. PRELIMINARY SERVICING.
a. Fill the crankcase with lubricating oil per the instructions contained in paragraph 3-1.
b. Check the oil sight gage for proper oil level.
Section IV. UNIT PREVENTIVE MAINTENANCE: CHECKS AND SERVICES (PMCS)
3-9. GENERAL.
a. To obtain long life and best performance from the air compressor, you must adhere to the preventive
maintenance checks and services contained in this section. The required PMCS to be performed by unit maintenance
b. The item numbers of the tables indicate the sequence of the PMCS.
c. If something doesn't work, troubleshoot it with the instructions in this manual or notify your supervisor.
d. Always do your preventive maintenance in the same order, so it gets to be a habit. Once you've had some
practice, you'll spot anything wrong in a hurry.
e. If anything looks wrong and you can't fix it, write it down on your DA Form 2404. If you find something seriously
wrong, report it to intermediate maintenance as soon as possible.
f. When you do your preventive maintenance, take along the tools and equipment you'll need to make all the
checks. You always need a rag or two.
3-4