TM 5-4310-380-13
Section II. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Para.
Para.
Common Tools and Equipment.......................... 3-3
Special Tools, TMDE, and Support Equipment... 3-4
Repair Parts................................ ....................... 3-5
3-3. COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
3-4. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT.
No special tools and equipment are required to maintain the air compressor at the Unit Maintenance Level.
3-5. REPAIR PARTS.
Repair parts are listed and illustrated in the repair parts and special tools list (TM 5-4310-380-23P) covering unit and
intermediate maintenance for the equipment.
Section III. SERVICE UPON RECEIPT OF EQUIPMENT
Para.
Para.
Checking Unpacked Equipment ......................... 3-6
Installation................................ .......................... 3-7
Preliminary Servicing ................................ ......... 3-8
3-6. CHECKING UNPACKED EQUIPMENT.
a. Inspect the equipment for damage incurred during shipment. If the equipment h s been damaged, report the
a
damage on DD Form 6, Packaging Improvement Report.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA PAM 738-750.
c. Check to see whether the equipment has been modified.
3-3