Home
Download PDF
Order CD-ROM
Order in Print
4-56. JUNCTION BOX MAINTENANCE.
JUNCTION BOX MAINTENANCE (Con't)
TM-5-4310-452-14 Compressor Air: Rotary Screw 750 CFM 100 PSI Wheel-Mounted DED SULLIAR Model 750 DP Manual
Page Navigation
153
154
155
156
157
158
159
160
161
162
163
TM 5-4310-452-14
4-56. JUNCTION BOX MAINTENANCE (Con’t).
b.
DISASSEMBLY
1.
Remove 5 nuts (14), electrical leads (27), and 6 electrical leads (45) from terminal block (13).
2.
Remove 2 bolts (12), self-locking nuts (15), and terminal block (13) from junction box (4). Discard self-locking nuts.
3.
Remove 6 nuts (49), lockwashers (48), and electrical leads (44) from 3
circuit breakers
(9). Remove circuit breakers
from bracket (11). Discard lockwashers.
4.
Remove 2 screws (10), nuts (55), and bracket (11) from junction box (4).
5.
Remove screw (1 7), nut (16), and electrical lead (38) from resistor (18).
6.
Remove 2 nuts (19 and 22) and electrical leads (39) from diodes (21). Remove screw (20), nut (25), and diodes from
resistor (18), 7.
Remove 2 screws (26), nuts (24), mounting clips (23), resistor (18), and electrical leads (31) from
junction box (4).
8.
Remove 4 screws (51), nuts (50), and electrical leads (28 and 39) from 2 resistors (52).
9.
Remove 4 screws (56), nuts (54), mounting clips (53), and 2 resistors (52) from junction box (4).
10. Remove 2 capscrews (37) and self-locking nuts (46) from receptacle connector (36) and
junction box
(4). Discard
self-locking nuts.
11. Pull receptacle connector (36) out of junction box (4). Loosen 6 screws (35) and remove electrical leads (30) from
receptacle connector.
12. Remove 4 screws (33) and nuts (34) from receptacle connector (32) and junction box (4). Remove receptacle
connector and wiring harness (29).
13. Remove 4 capscrews (42), self-locking nuts (47), connector cover (41), receptacle connector (40) and wiring harness
(43) from junction box (4). Discard self-locking nuts.
c.
ASSEMBLY
1.
Position receptacle connector (40) and wiring harness (43) in place in junction box (4). Install connector cover (41), 4
capscrews (42), and new self-locking nuts (47).
2.
Position receptacle connector (32) and wiring harness (29) in place in junction box (4), Install 4 screws (33) and nuts
(34).
3.
Position receptacle connector (36) at connector opening. Install 6 electrical leads (30) and tighten 6 screws (35).
4.
Install receptacle connector (36), 2 capscrews (37), and new self-locking nuts (46) in junction box (4).
5.
Install 2 resistors (52), 4 mounting clips (53), nuts (54), and screws (56) in junction box (4).
6.
Install 4 electrical leads (28 and 39) on 2 resistors (52) with 4 screws (51) and nuts (50).
7.
Install resistor (18), electrical lead (31), and 2 mounting clips (23) in junction box (4) with 2 screws (26) and nuts (24).
8.
Install 2 diodes (21) on resistor (18) with screw (20) and nut (25). Install 2 electrical leads (39) and nuts (19) on
diodes
, 9.
Install electrical lead (38) on resistor (18) with screw (17) and nut (16).
10. Install bracket (11) in
junction box
(4) with 2 screws (10) and nuts (55). Install 3
circuit breaker
s (9) in bracket (11).
11. Install 6 electrical leads (44), new lockwashers (48), and nuts (49) on
circuit breaker
s (9).
4-104
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business