TM9-4310-396-132-5 INITIAL ADJUSTMENTS AND CHECKS.2-5.1Special adjustments and checks are not required.2-6OPERATING PROCEDURES.NOTEIf gage shows air pressure, it is important to drain all air tank receiver (2,Figure 2-6) air pressure to 0 psi allowing easy cranking and engine starting.2-6.1PreparationforStarting. Open frame control panel access door (1, Figure 2-7) and observe pressuregage (2).Figure 2-7. FrameControlPanelLocation.2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business