TM9-4310-396-13Section III - OPERATOR MAINTENANCE PROCEDURES3-3 GENERAL.This section contains the step-by-step procedures for performing maintenance for the compressor assembly.Personnel required are listed only if the task requires more than one.MAINTENANCE OF COMPLETE TOP HOOD ASSEMBLY, FRAME CONTROL PANEL, AND VENT LOUVERS3-4 SERVICE COMPLETE TOP HOOD ASSEMBLY, FRAME CONTROL PANEL, AND VENT LOUVERS.This task covers:a. Inspection b. ServiceINITIALSETUPToolsEquipmentConditions:NoneEngine stopped, para. 2-6.8Materials/PartsLubricant Spray (Appendix E, item 13)Rag, Wiping (Appendix E, item 3)a. Inspection. Refer to PMCS Table 2-3.b.Service.(1) Refer to L094310-396-12.(2) Wipe clean of excess lubricant.(3) If access doors or vent louvers are inoperable, notify Unit maintenance.3-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business