TM9-4310-396-13
Section VI - UNIT MAINTENANCE PROCEDURES
4-11 GENERAL INSTRUCTIONS.
Maintenance instructions in this section will list resources required, personnel required, and equipment
condition for the start of the procedure.
NOTE
Resources required are not listed unless they apply to this procedure. Personnel
required are listed only if the task requires more than one. If "Personnel" is
not listed, it means one person can do the task. The normal standard equipment
condition to start a maintenance task is engine stopped and at ambient temperature.
MAINTENANCE OF COMPLETE TOP HOOD ASSEMBLY AND FRAME CONTROL PANEL
4-12. REPLACE COMPLETE TOP HOOD ASSEMBLY AND FRAME CONTROL PANEL.
This task covers:
a. Removal
c. Installation
b. Repair
INITIAL SETUP
Tools
Equipment Conditions:
General Mechanics Tool Kit
Parking brake set, para. 3-8
Engine stopped, para. 2-6.8
Storage battery disconnected, para. 4-26
Tail gate open
Inlet heater lid off
Materials/Parts
Personnel
Tape, Adhesive (Appendix E, item 19)
2 persons for mechanical lifting
Adhesive, Tube (Appendix E, item 16)
4 persons for manual lifting
Insulation (Appendix E, item 11)
Paint, Green (Appendix E, item 12)
Nonmetallic Seal (P/N 02352)
a. Removal.
(1) Remove nonmetallic seal (1, Figure 4-1) from frame control panel (2).
(2) Remove flat machine screws (3).