TM 9-4310-397-14
6-11. CRANKSHAFT, PULLEY, IDLER GEARS, AND MAIN BEARINGS INSPECTION, REPAIR AND
REPLACEMENT. - Continued
(4)
Install flywheel housing and flywheel per paragraph 6-5.
(5)
Install crank shaft pulley with cap screw and flat washer. Torque cap screws to 110 ft lb (150 Nm).
(6)
Install lube oil stem by-pass valve assembly per paragraph 6-9.
(7)
Install front plate, timing gear train, camshaft, and balancer shafts (if equipped) per paragraph 6-9.
(8) Install oil pump assembly per paragraph 6-8.
(9) Install oil slinger 6-9.
(10) Install timing gear cover gasket, cover, oil pressure regulating valve assembly and front oil seal per paragraph 6-
9.
(11) Install oil pan per paragraph 6-7.
(12) Install cam followers, push rods, rocker arm assembly per paragraph 6-6.
(13) Install fuel supply pump and injection pump per paragraph 4-68 and 6-4.
(14) Install starting motor per paragraph 4-66.
(15) Adjust valve clearance per paragraph 6-6.
(16) Install fan belt. Install engine in air compressor per paragraph 4-65.
(17) Fill engine with clean oil and proper coolant per paragraph 4-6.
(18) Change engine oil and engine oil filter after 100 hours of operation.
6-90