TM 5-4310-227-15
(4) Install the nipple, valve, and fittings
and connect the aftercooler tube (6,
opening draincock.
(5) Position the pipe clamps (12, fig. 3-
air receiver tank (4).
10) on the brackets (10) and secure
b. Cleaning and Inspection (Models OEG-
4 5 8 - E N G - 1 , O E G - 4 5 8 - E N G - 2 , and OEG-
and nuts.
458-ENG-3).
(6) Connect tee to-unloader valve tube
(1) Clean draincock with an approved
(20) to the tee (17) and the unload-
cleaning solvent and dry thoroughly.
er valve (11).
(2) Inspect for corrision, cracks, and de-
(7) Connect the tube (18) to the adapters.
fective threads.
(3) Replace a defective draincock.
c. Installation (Models 0EG-458-ENG-
(Models
OEG-458-ENG-1
a. Removal
1, OEG-458-ENG-2, a n d OEG-458-ENG-
OEG-458-ENG-2, and OEG-458-ENG-3).
3). Install draincock (7, fig. 1-5) in
the air
receiver tank (4).
(1) Turn off engine.
Section XIII.
CONTROLS AND INSTRUMENTS
( 5 ) Replace all damaged or defective
parts.
The controls and instruments for operation
o f the models BMW-452-ENG and BMW-
installation of the cointrols and instruments.
the instrument panel located at the right front
through 2-24 for a description of these com-
a. Removal.
ponents.
(1) Stop the
3-92. Controls and Instruments
all air from the air receiver
(2) Release
tank by
opening the draincock.
(3) Remove
moval of the controls and instruments.
the air receiver tank.
b. Cleaning and Inspection.
(1) Clean all parts with a cloth dampened
b. Cleaning and Inspection.
with an approved cleaning solvent
(1) Clean the pressure gage with a cloth
and dry thoroughly.
dampened with an approved cleaning
(2) Inspect the instruments for broken
solvent. Dry with a clean, dry lint
glass, loose terminals, and other dam-
free cloth.
age.
(2) Inspect the pressure gage for cracks,
(3) I n s p e c t the controls for cracked
rust, broken glass, worn threads, or
knobs, kinked or broken cables, im-
o t h e r damage. Replace a damaged
proper operation, and other damage.
pressure gage.
(4) Inspect the switches for improper op-
C . Installation. Install the pressure gage
eration, damaged or corroded termi-
nals, and other damage.