V-belt guard, removal and installation.
(2) Inspect all parts for breaks, cracks, and
other damage. Replace a defective part.
a. Removal
Remove and dis-
and Disassembly.
c. Reassembly and Installation. Reassemble and
install the release valve in the reverse order of that
b. Cleaning and Inspection.
(1) Clean all parts in an approved cleaning
solvent and dry thoroughly.
(2) Inspect all parts for cracks, breaks, and
a. Removal.
other damage. Replace a defective part.
c. Reassembly and Installation. Reassemble and
install in the reverse order of that shown in figure
73. Release and Safety Valve
(5) Remove the air receiver tank as illustrated
a. Removal and Disassembly. Remove and dis-
assemble the release valve in numerical sequence as
b. Cleaning, Inspection, and Testing.
b. Cleaning and Inspection.
(1) Clean the interior of the air tank with live
(1) Clean all parts in an approved cleaning
steam, if available, or with an approved
cleaning solvent. Dry thoroughly.
solvent and dry thoroughly.