TM 5-4310-277-14
Section Il. MOVEMENT TO A NEW WORK SITE
4-3. Dismantling for
Movement
d. Remove the air hose assembly and inflator
gage (fir. 4-5) also remove the globe valve on Model
a. Build up the pressure in the air receiver to just
Cover
HGR5-8M-1, and Model HGR5-8M-6.
below 140 psi (9.8420 kg per sq cm).
t h e opening t o t h e a i r r e c e i v e r , h o s e
b. Stop the engine. Open the draincock and blow
ends, and opening to inflater gage with
suitable plugs caps, or tape to prevent
draincock.
f o r e i g n matter from entering.
c. Drain the fuel tank.
Change 1